News
What about the installation of the equipment? How long does it take? Are the costs included in offer?
2021.10.22
|
FAQ
Fung Chang will test run every machine in our factory before the shipment. We will also send our technician to your factory for the installation. Generally speaking, it takes about 2~3 days for the installation of 1 set of machine.
Normally, the cost is not included in the offer. The charge is as follows:
1. Round trip air ticket at buyer's place.
2. Domestic transportation & accommodation at buyer’s place.